Project Description

Mechanical/Electrical/Roofing Superintendent Services – Provide field supervision on a staff extension basis for KCS West during the performance of the removal and replacement of existing “Boil-Coil” rooftop mechanical equipment, installation on new mechanical platforms, performing of roofing repairs, installation of new electrical services and devices associated with the new mechanical equipment requirement by the installation of a 2 tiered “Boil Cool” unit for Tofu processing. Create food protection barriers and air conditioning to allow for continual operation of existing adjacent food preparation assembly lines while construction was ongoing.  Assist in testing and start-up of new equipment, pumps and mechanical equipment.